Home > caf-4 > 11-07-20_Phase_I_repairing_at_Compton_airport > Chuck and Robin.jpg (View Full Page)
Prev Next LoFi Loop  4/1/2018 16:43


Sheet metal man Chuck showing Robin his plan to repair right flap

CAPAOA selected Aircraft Rebuilder of Compton Airport for the Phase 1 repairs. Phase 1 repairs include most required sheet metal works:
1. Right flap;
2. Firewall and its brackets;
3. Right fuselage longeron; and
4. Left wing bottom skin.